29 Lug BIM and value analysis for applying the performance-based approach in the construction sector
Article by Marika Tomasi
1. Context
Recent developments in digital technology have boosted efficiency across many manufacturing sectors, leading to reductions in both costs and production times. This cannot be said of the construction sector, whose obsolescence was measured twenty years ago in a study conducted by Paul Teicholz (Stanford University). In this research, productivity is defined as the ratio of contract value to hours worked; between 1964 and 2003, whilst the manufacturing sector in general (excluding agriculture) grew at an average annual rate of 1.77 per cent, productivity in the construction sector recorded an average decline of 0.59 per cent per year (Teicholz, 2004). Over the period under consideration, therefore, overall productivity more than doubled, whilst the construction sector suffered an overall decline of around 20 per cent.
This is the context against which the search for innovative solutions to boost productivity – as well as profitability – in the construction sector takes place. Nine years after the publication of his study, in a second article on the subject, Teicholz (2013) identified the effective use of BIM as one of the solutions for increasing productivity. The methodology known as ‘Building Information Modelling’ (BIM) enables innovation in the construction industry by aggregating information provided by the various disciplines involved in the building process and organising the data in such a way as to increase efficiency from the design phase through to construction, maintenance and, finally, the decommissioning of the property.
1.1. Value analysis in the construction process
The complexity of the construction sector necessitates the adoption of a multidisciplinary approach aimed at coordinating the various stakeholders and interests involved in a project. At a strategic level, multi-criteria analysis enables a problem to be structured in relation to measurable objectives, considering the impacts of the analysed solutions not only in economic terms, but by adopting a broader perspective (Fattinnanzi & Mondini, 2015). Multi-criteria analysis supports strategic decision-making, particularly at the management level, but the systematic adoption of multiple perspectives and the measurability of evaluation criteria are also valuable for product selection and development. Value analysis is a methodology developed in the second half of the last century to support product optimisation from a technical perspective:
Value Analysis (VA) is an organised activity carried out by a coordinated group comprising experts from various disciplines and non-experts, aimed at analysing the functions that a product or service must perform in order to meet the expressed or implicit needs of the client or user, so as to achieve the necessary and required performance at the lowest overall cost compatible with the required performance levels[1].
(Maffei, 1998, p. 23)
The relationship between value and performance was formalised by the pioneer of this method, Lawrence D. Miles, who identified two conditions under which a product’s value increases:
- cost reduction whilst maintaining the same level of performance;
- increased performance where the customer needs, wants and is willing to pay for better performance.
Miles adapted and systematised the use of the analysis matrix – a method in which different options are evaluated by assigning ‘weights’ – within the value analysis process. His proposal involves identifying the performance requirements of a product, classifying them in terms of priority, and subsequently evaluating various technological solutions on the basis of cost and achievable performance (Miles, 1989). The centrality of performance in product evaluation is now not only recognised as a valid and effective approach but is also the subject of European legislation.
1.2. Regulatory context
Regulation (EU) No 2024/3110 lays down the “harmonised rules for the marketing of construction products” within the EU single market, repealing the previous Regulation (EU) No 305/2011. For construction products falling within the scope of a harmonised standard, or alternatively, for which a European Technical Assessment has been issued, a Declaration of Performance and Conformity[2] must be drawn up and the CE marking must be affixed.
The presence of the CE marking certifies that the product in question complies with the parameters laid down by the relevant European standards. The responsibility for verifying that the product’s performance complies with the regulations lies with the manufacturer, except in the case of certain materials for which the involvement of an external certification body is required; this requirement is specified in the product’s reference standards. The CE marking has no expiry date, but the Declaration of Performance and Conformity must be kept up to date, with updates made where necessary in the event of changes to legislation, the product or its specifications. The European regulation has been transposed into Italian law by Legislative Decree 106/2017 concerning the ‘CE marking for construction products’ .
2. Thesis
The implementation of CE marking for construction products formalises the adoption of the performance-based approach, replacing the previous, commonly adopted practice of ‘workmanship to the highest standard’. The use of a performance-based approach allows designers to define the materials to be used on site based on expected performance, which then become requirements. Furthermore, this leads to the industrialisation of the process (off-site manufacturing), resulting in higher final quality of the work, lower overall costs and greater sustainability of the project as a whole.
The BIM approach to the construction process makes it possible to combine the geometric and dimensional characteristics of the product with its descriptive and performance-related characteristics. BIM “is a working methodology which, through a virtual representation (Modelling) of the building (Building), conveys information (Information)” (Carradori, 2017). The objects, represented as three-dimensional geometries, contain a wealth of non-geometric information relating, for example, to performance, costs and maintenance. The BIM methodology therefore represents an integrated approach to the construction process, from the early design stages right through to the decommissioning of the asset.
2.1. The potential of BIM methodology
The BIM report 2021 (Figure 1) provides a snapshot of the current operational situation based on the results of a questionnaire administered to professionals in the AEC[3] (ASSOBIM, 2021).

Figure 1 The BIM report 2021 by AssoBIM is available at this link.
Despite the positive results regarding the use of BIM in professional practice, the recognition of the benefits brought about by the application of this methodology, and the willingness to invest resources in the sector, the professionals interviewed highlighted three needs that translate into potential areas for research and development.
- The first is the need for libraries of generic BIM objects, which are therefore linked to the definition of performance rather than the selection and installation of specific products.
- The second, perhaps counterintuitively, points in the opposite direction: professionals would find it useful if manufacturers provided comprehensive and detailed BIM object libraries.
These two requests relate to different stages of the design process, in which the level of detail of the information varies significantly; however, it is interesting to note the common ground from which they stem, namely the need for digital objects to implement the BIM approach in professional practice.
- The third request from professionals is for the inclusion of codes and standards within BIM authoring software, further confirmation of the increasingly central role of BIM in the detailed design of projects, as well as of the growing regulation and standardisation of the sector.
2.2. The digitisation of objects
The modelling of real objects in digital form is not limited to the creation of virtual libraries containing the object’s geometry (digitisation), but pursues a more complex and useful objective: “the transformation of a production process, through technological tools that help interpret the data, with a view to eliminating inefficiencies, reducing costs and increasing revenue” (Maccarone, 2022), known as digitalisation.
The digitalisation process can be carried out at different levels of detail, which can be associated, for example, with various stages of the design process. The UNI 11337-4 standard defines various levels of information development for digital objects (LOD) in order to standardise modelling according to the intended use of the data[4]. For each LOD, the level of geometric detail and the information required are described; the scale ranges from A – symbolic object to G – as-built object. Once the parameters of the context within which to digitise real-world objects have been defined, it is necessary to identify modelling standards for collecting and transmitting information about a product.
The IFC (Industry Foundation Classes) format is “a standardised digital description of the built asset sector”[5], developed by buildingSMART International and recognised as an international standard by the UNI EN ISO 16739-1:2024 standard. In practice, it is a standardised model that logically encodes the identifying information, geometry and attributes of objects, as well as their interrelationships. As an open format, it is used to transfer data that can be viewed and edited in BIM authoring software, regardless of the specific tool used. Another open format for data sharing is Green Building XML (gbxml), developed to facilitate the transfer of information between CAD models and building design and analysis software[6]. The .ifc and .gbxml files are therefore a fundamental tool for enabling data sharing, making collaboration possible between professionals, even across different sectors. It is worth noting that poor interoperability was identified as an obstacle to increased productivity in the construction sector by Teicholz as long as twenty years ago (2004).
2.3. Energy calculation software
The complexity of the design process is supported by increasingly sophisticated and accurate modelling and calculation software. Energy simulation of buildings is a valuable tool for identifying the best technological solutions to prevent heat loss, use resources efficiently, and ensure occupant comfort. This can be carried out both during the preliminary design phase and for the purpose of obtaining energy performance certificates. The CTI (Italian Thermotechnical Committee) carries out verification of commercial software and tools for calculating the energy performance of buildings, in accordance with Article 7 of the Ministerial Decree of 26 June 2015. On the relevant web page[7], the CTI provides a list of validated software applications; as of February 2026, the number of applications listed stands at 19.
A key feature for ensuring an efficient design process is interoperability between BIM software and energy simulation applications (BEM – Building Energy Modelling). The ‘automatic’ transfer of data between software applications speeds up operations and reduces potential errors arising from remodelling. Interoperability is ensured by open formats (§2.2), but the actual reading of data and any subsequent re-exportation are currently the subject of research. A useful study in this regard was presented in two Master’s theses defended at the University of Padua (Presa, 2021; Levorato, 2021). On these occasions, the transfer of data from Revit (Autodesk) to EC700 Building Energy Performance Calculation (Edilclima) was tested, both in .ifc format and via the relevant plug-in (EC770 Integrated Technical Design for Revit). Following this initial trial, the interoperability between Revit and the TERMOLOG (Logical Soft) and TerMus (Acca Software) applications was also investigated. The use of applications from the Autodesk suite was, however, tested by BIS-Lab® (Carradori, 2020), which published a case study on the transfer of data from Revit to Green Building Studio in .gbxml format and the subsequent visualisation of the calculation results in Insight 360 (Figure 2).

Figura 2 A data flow which, starting from the model developed in Revit, enables results to be obtained in Insight 360 (Carradori, 2020).
The conclusions of these studies are unanimous in identifying the great potential of these tools, but also the need to address practical aspects (such as adapting the BIM model for import into BEM software) and programming issues (for example, the need for graphical output to enable immediate verification).
2.4. Research gap
The benefits for professionals of having digital libraries in a standard format, complete with geometric, performance, material and colour data, as well as maintenance information, are readily apparent. Designers would be able to base their design work on an approach centred on data and the availability of products on the market; furthermore, the use of BIM would make it possible to identify any clashes between building elements and to assess the project’s performance (including energy performance). At the same time, two advantages can be identified for manufacturers in sharing their product libraries in digital format with designers. Access to digital libraries enables manufacturers to stand out from their competitors by forging direct relationships that foster designer loyalty – a factor that is likely to remain stable over time. Furthermore, a willingness to engage with users can create a feedback loop aimed at improving production. Designers, in fact, can provide valuable feedback which, if taken on board, has the potential to improve product design and manufacturing processes, reduce engineering costs, and enhance assembly and installation methods on site (ASSOBIM, 2023).
A systematic review of BIM topics, the performance-based approach and the energy analysis of buildings has brought to light several interrelated areas of research, all geared towards innovation and the optimisation of the design and production process. In order to establish a solid foundation from which to proceed, this preliminary study aims to evaluate current approaches to communication and data sharing, with a particular focus on performance-related issues. For the purposes of this research, building components relating to thermal and acoustic insulation were selected.
3. Preliminary results
3.1. Case study
Swisspor Italia[8], originally known as L’isolante, is a manufacturer of thermal and acoustic insulation products based in Roverbella (MN). In 2022, L’isolante was acquired by the multinational Swisspor[9], “a leader in the field of building waterproofing and insulation and a leading Swiss manufacturer and supplier of products and systems for energy-efficient building envelopes”. The multinational is part of the Swisspor Group, which comprises several companies specialising in building envelope products, construction materials and prefabricated solutions.
Swisspor has offices in Switzerland, Germany, Poland, Austria, Italy and Romania. Swisspor Italia’s production covers various product ranges in EPS, PIR and XPS.
3.2. Market analysis
The purpose of this analysis is to provide an overview of the communication and data-sharing strategies of insulation manufacturers in the areas of BIM and CE marking. The list of companies assessed was compiled based on the context of swisspor Italia; specifically, ANIT member companies – the National Association for Thermal and Acoustic Insulation – were selected, having provided their own databases for import into ANIT’s calculation software (PAN – thermal calculations; IRIS – thermal bridges; ECHO – acoustic calculations).
3.2.1. BIM Methodology
There are 36 ANIT member companies that have shared a database relating to their products[10] (data updated to February 2026). Of these, 13 provide BIM models of their products (36 per cent), 6 provide CAD details (17 per cent), and 9 provide both types of digital model (25 per cent) (Figure 3). As for the remaining 22 per cent, no BIM or CAD databases were found on their websites in addition to the ANIT database.

Figura 3 Database provided by ANIT member companies.
A particularly virtuous example is represented by companies that have uploaded BIM models to web portals such as bimobject[11] and Buildup[12]. This solution can be a valuable tool for communicating with professionals: uploading one’s database to a portal specialising in the aggregation of construction details allows one to build a bridge between the company and the designer, who can easily access the solutions offered by the manufacturer and consequently incorporate them into their own model. The bimobject portal, for example, allows manufacturers to upload their BIM databases and enables designers to browse for construction details. To gauge the site’s popularity, a search was carried out using the following parameters (Figure 4):
- Building materials = “Insulation”
- File type = “Ifc” OR “Revit”
More than 900 product models (of which 285 are available in Italy) were obtained, provided by a total of 53 companies. The use of the keyword “Revit” alongside “IFC” stems from the limited use of the open format: in fact, models in .ifc format were found only on the websites of 6 of the 22 ANIT member companies that provide BIM details.

Figura 4 Screenshot of the search carried out on the bimobject portal.
Finally, two proposals regarding the accessibility of BIM models are worth noting. Rockwool has developed a plugin[13] for Revit to enable designers to select products based on the requirements specified in a cloud-based library; Knauf Planner Suite[14] is a web application – also available as a plugin for Revit and Archicad – which enables users to search for products, check whether data complies with any updates to building systems, and create specifications.
3.2.2. CE marking
Product performance specifications can be found in the technical data sheets available on all the websites of the assessed companies. Most organisations also make available Declarations of Performance and Conformity (DoPCs), i.e. the document approved by the company (or a third-party body, if required) that declares the guaranteed performance. Among the ANIT-registered companies assessed, it was possible to view or download the DoPC for the products in 75 per cent of cases.
A best practice example is provided by companies that feature a page on their websites specifically created to host the DoPCs (Figure 5). Dedicating space to this topic is considered an excellent communication strategy, as it allows the issue of CE marking to stand out within the body of technical documentation shared with the website user.

Figure 5 Screenshot of the swisspor Italia website page dedicated to the collection of DoPCs.
4. Conclusions and future developments
This article sets out a research context of interest to various stakeholders. The initial overview of the implementation of BIM methodology and the performance-based approach in the construction sector has revealed the potential for innovation and development in relation to these two areas. During the subsequent state-of-the-art analysis, carried out specifically with regard to thermal and acoustic insulation products, limitations and best practices were identified concerning the sharing of product-related data, including performance data.
The key points of the methodological approach adopted in this preliminary phase are:
- the analysis was carried out on industry operators who demonstrated a willingness to publish technical information, albeit at varying levels of detail;
- the process of searching for product information was simulated from the perspective of a designer/web user browsing company websites;
- best practices were identified from which to draw inspiration for a subsequent phase of innovation in information management (storage and sharing).
BIS-Lab® – Building Innovation & Skills-Lab has been focusing on these issues for years, as demonstrated by the support provided to architect Ilaria Ghilardi in the development of her master’s thesis (Contec, 2021). In this work, the decision to use a timber structure was re-evaluated by applying value analysis, comparing it with a steel structure. The subject of the study was the AIA plant in Nogarole Rocca (VR), developed and built by Contec Ingegneria, which contributed to the work with its expertise and experience. Building on this and other research experiences, BIS-Lab® aims to continue its research into the performance-based approach applied through BIM methodology, acting as a link between designers and manufacturers.
Bibliography
ASSOBIM. (2021). BIM report 2021. Tratto il giorno Luglio 08, 2024 da https://www.assobim.it/categoria/download-materiali/
ASSOBIM. (2023, Luglio 7). BIM e digitalizzazione di prodotti e sistemi. 01building. Tratto il giorno Luglio 03, 2024 da https://www.01building.it/bim/bim-e-digitalizzazione-di-prodotti-e-sistemi/
Carradori, M. (2017, Febbraio 28). BIM – Building Information Modeling: i princìpi di una rivoluzione. Tratto il giorno Agosto 27, 2024 da https://www.bis-lab.eu/2017/02/28/bim-building-information-modeling-i-principi-di-una-rivoluzione/
Carradori, M. (2020, Aprile 21). Sostenibilità model-based: l’analisi energetica con Revit, Green Building Studio ed Insight. Tratto il giorno Agosto 27, 2024 da https://www.bis-lab.eu/2020/04/21/revit-green-building-studio-ed-insight/
Contec. (2021, Novembre 24). Il BIM per la valutazione dell’impatto ambientale dei sistemi costruttivi. Tratto il giorno Luglio 12, 2024 da https://www.bis-lab.eu/2021/11/24/il-bim-per-la-valutazione-dellimpatto-ambientale/
Fattinnanzi, E., & Mondini, G. (2015). L’analisi multicriteri tra valutazione e decisione. Roma: DEI.
Levorato, V. (2021). Analisi di interoperabilità tra modelli BIM e ambienti di simulazione energetica: studio dello standard IFC per la progettazione impiantistica. Padova: Università di Padova – Dipartimento di Ingegneria Civile, Edile e Ambientale – ICEA. Tratto da https://hdl.handle.net/20.500.12608/29516
Maccarone, V. (2022, Ottobre 21). Digitalizzare i processi di cantiere: come ridurre i costi ed essere sostenibili. SAIE 2022. Tratto il giorno Agosto 29, 2024 da https://www.assobim.it/saie-2022-digitalizzare-i-processi-di-cantiere-come-ridurre-i-c-osti-ed-essere-sostenibili/
Maffei, P. L. (1998). L’analisi del valore nel processo edilizio. In P. L. Maffei, Qualità totale e analisi del valore nel processo edilizio (p. 11-64). Pisa: Edizioni ETS.
Miles, L. D. (1989). Techniques of Value Analysis and Engineering (III ed.). Eleanor Miles Walker.
Presa, E. (2021). Analisi di interoperabilità tra modelli BIM e ambienti di simulazione energetica: standard IFC per la digitalizzazione di ponti termici e ombreggiamenti. Padova: Università di Padova – Dipartimento di Ingegneria Civile, Edile e Ambientale – ICEA. Tratto da https://hdl.handle.net/20.500.12608/29517
Teicholz, P. (2004, Aprile 14). Labor-Productivity Declines in the Construction Industry: Causes and Remedies. AECbytes. Tratto il giorno Agosto 2024, 30 da https://www.aecbytes.com/viewpoint/2004/issue_4.html
Teicholz, P. (2013, Marzo 14). Labor-Productivity Declines in the Construction Industry: Causes and Remedies (Another Look). AECbytes. Tratto il giorno Settembre 02, 2024 da https://www.aecbytes.com/viewpoint/2013/issue_67.html
[1] Original: “L’Analisi del Valore (AV) è una attività organizzata svolta da un gruppo di esperti di varia disciplina e di non esperti, con un coordinamento, tesa ad analizzare le funzioni che devono essere svolte da un prodotto o da un servizio, allo scopo di soddisfare alle esigenze espresse o implicite della committenza/utenza, per ottenere le prestazioni necessarie e richieste al più basso costo globale compatibile con i richiesti livelli prestazionali.”
[2] Regulation (EU) 2024/3110, which entered into force on 8 January 2026, replaces the previous Declaration of Performance (DoP) with a Declaration of Performance and Conformity (DoPC); as part of this research, carried out during the transition period between the two regulations, the updated nomenclature has been adopted to also include materials under analysis that are still being updated by the market.
[3] Architecture-Engineering-Construction
[4] The concept of LOD is addressed not only by Italian legislation but also by the AIA G202-2013 Building Information Modelling Protocol drawn up by the American Institute of Architects (source: https://www.01building.it/bim/lod-progettazione-bim/).
[5] https://www.buildingsmartitalia.org/standard/standard-bs/industry-foundation-classes-ifc/
[6] https://www.gbxml.org/About_GreenBuildingXML_gbXML
[7] https://www.cti2000.it/index.php?controller=sezioni&action=show&subid=62
[8] https://www.swisspor.com/it-it?redirect=true
[9] https://www.swissporgroup.com/it
[10] https://www.anit.it/banca-dati-software-anit/
[11] https://www.bimobject.com/it
[12] https://ch.buildup.group/it
[13] https://bim.rockwool.it/?co=download_autodesk_plugin
[14] https://discover.knauf.com/it-it/planner-suite